
20
4. Place conduits
Fig. 20 Conduit entry location
▶
Use the holes in the top of the main cabinet to
install your conduits.
▶
Seal unused holes with the provided caps.
Intended
use
Conduit
size
Wire gauge
Microgrid
AC
2 inches
2 AWG - 3/0
AWG
Generator
AC
1 inch
20 AWG - 8 AWG
Modbus
1 inch
24 AWG
Ethernet
1 inch
24 AWG
Grid AC
2 inches
2 AWG - 3/0
AWG
Table 2 Conduit entries and cable sizes
Sonnen has created the appropriate
number and size conduit penetrations
for a typical installation. Every attempt
should be made to follow this conduit
legend to facilitate proper wire installation to the
unit. Making new or enlarging existing conduit
penetrations will void the system's warranty.
5. Remove access panel
Fig. 21 Removing battery cabinet access panel cover
Tools needed:
‒
Phillips screwdriver
You can remove the access panel on the side
of the battery cabinet to facilitate work on the
battery module connections.
▶
Remove the screws using a Phillips screwdriver.
▶
Mount the cover after finishing work on the
storage system.
Grid AC
Microgrid AC
Generator AC (optional)
Modbus
Ethernet
Summary of Contents for sonnenBatterie ecoLinx 10
Page 2: ......
Page 4: ......
Page 8: ......
Page 17: ...9 Dimensions Fig 1 Storage system dimensions Key components Fig 2 ecoLinx key components...
Page 30: ...22 page 23 page 23 page 29 page 23 Fig 22 Terminal map for ecoLinx...
Page 53: ...45 Appendix 1 Nameplates...
Page 54: ...46...
Page 55: ...47...
Page 61: ...53...
Page 62: ......
Page 63: ......