OPERATING MANUAL PAT-800/805 version 1.09
28
Notes:
- Tested device must be turned on.
- Test circuit is electrically isolated from the mains and from PE mains lead.
- The measurement result should be read after displayed values are stabilized.
- After the measurement the tested object is automatically discharged.
4.5.1 R
ISO
measurement on devices of Class I
Connect the mains plug of the tested device into the test socket
of the meter. The measurement is made between shorted L, N
and PE. In addition, it is possible to carry out the measurement
with the probe connected to
R
ISO
-
socket (
R
ISO
for PAT-800).
With continuous measurement set (time =
) press and hold
START
. To block
the measurement press
ENTER
.
At the time with pre-set value it is not
necessary.
Signalling the presence of high-voltage
View of the screen during
measurement.
Time remaining to the end of
the measurement
The measurement ends after a preset time runs out or
after pressing
STOP/ESC
.
After measuring is completed, read the result.
Summary of Contents for PAT-800
Page 1: ......
Page 2: ......
Page 58: ...OPERATING MANUAL PAT 800 805 version 1 09 56...
Page 59: ......
Page 60: ......