2-4-3. TG-290 Board, SEC-59 Board
Preparation
1. Remove the bottom harness guard. (Refer to “2-2. Bottom Harness Guard”.)
2. Remove the outside panel assembly. (Refer to “2-3. Outside Panel Assembly”.)
3. Remove the inside panel assembly. (Refer to “2-4. Inside Panel Assembly”.)
4. Remove the SS-108 board. (Refer to “2-4-2. SS-108 Board”.)
Procedure
1. Disconnect the flexible flat cable from the connector (CN004) on the VSW-82 board.
2. Disconnect the flexible flat cables from the two connectors (CN001, CN002) on the SEC-59 board.
3. Remove the three screws, and then remove the TG, SEC board assembly.
4. Remove the precision screw, and then remove the SEC-59 board.
5. Remove the precision screw, and then remove the TG-290 board.
6. Disconnect the flexible flat cable from the connector (CN001) on the TG-290 board.
7. Install the removed parts by reversing the steps of removal.
PTP2 x 5
VSW-82 board
Flexible flat cables
CN001
SEC-59 board
CN004
CN002
TG, SEC board assembly
Precision screw
(P2 x 4)
Precision screw
(P2 x 4)
Flexible flat cable
TG-290 board
CN001
SEC-59 board
Toggle packings