55
12.
Start-up
After loading the pellets into the deposit (see chapter 13), press and hold the
ON/OFF button for 3s, to start the equipment. During the lighting phase, the
display will show the message
“Ativação” (Activation) until this phase is
completed
.
The
pellets
are fed through the supply channel to the burning basket (combustion
chamber), where they will be ignited using a heat resistor. This process may take 5
to 10 minutes, depending on whether the worm screw used to push through the
pellets has been previously filled with fuel or is empty. Once the ignition phase is
completed, the message "On" appears on the display. The heating power can be
adjusted at any time by pressing the power selection button for approximately 1
second. You can select from the five pre-set power levels that are available. The
selected power is indicated on the display. The initial power status at each start-up
will correspond to the power level set before the last stop.
Important notice: Before starting up the unit, please check to
determine if the deflector plate is in place.
12.1.
Stop
The stop sequence of the unit is started by pressing the ON/OFF button for 3 sec.
The display will show
“Desativação”
(Disabling) until full completion of this phase.
The extractor will operate until the fume temperature of 64ºC is reached,
to
guarantee that all the material has been burnt.
12.2.
Turning Off the Unit
The unit should only be disconnected after its full stop. Make sure the
“Off”
shows
on the display before disconnecting the unit. If necessary, disconnect the power
cable from the mains.
Summary of Contents for Atlantic
Page 77: ...76 ...
Page 78: ...77 ...
Page 79: ...78 ...
Page 85: ...84 20 Electrical Diagram of the Fire Unit Figure 68 Electrical diagram ...
Page 100: ...99 25 2 Flow chart Flow chart 1 Lighting ...
Page 101: ...100 ...
Page 102: ...101 Flow chart 2 Disabling Note The circulator pump off below 40 C water temperature ...