Step 1: Activating the System
1. Verify that the inverter ON/OFF switch is OFF.
2. Move the StorEdge Connection Unit switch to the ON position.
3. If not already removed, remove the inverter cover: Open the inverter cover’s six Allen screws and
carefully pull the cover horizontally before lowering it.
WARNING!
ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when the inverter cover is
removed.
4.
Activate the inverter:
a. Verify that the card S/N matches the inverter S/N.
b. Insert the card into the slot marked "
CARD
" on the communication board.
c. Turn AC ON.
d. LCD shows:
Running Script...
è
Done!
Figure 24: Activation card
If LCD shows:
Failed
:
l
Turn AC OFF and ON (reset), and repeat the activation process.
l
Use the activation code that appears on the certification inverter label to manually activate the
inverter.
l
If the problem persists, contact SolarEdge Support.
NOTE
You can use the activation code that appears on the certification inverter label to
activate the inverter in case of a script error or a missing activation card.
5. Verify that the inverter is configured to the proper country: Press the LCD light button until reaching
the ID status screen:
D S P 1 / 2 : 1 . 0 2 1 0 / 1 . 0 0 3 4
C P U : 0 0 0 3 . 1 4 x x
C o u n t r y : E S P
Chapter 6: Commissioning the Installation
SolarEdge
-
StorEdge
-Single
Battery/High
Capacity
Installation
MAN-01-00283-
1.1
35