Chapter 4: Installing the Backed-up Loads
Panel and Meter
This chapter describes installation of the backed-up loads panel and a meter.
Installing the Backed-up Loads Panel
Install a secondary AC panel for backed-up loads (not supplied by SolarEdge). Rewire the backed-up loads
through this panel.
Install one pole 25A as the main circuit breaker.
Figure 10: Backed-up Loads Panel
SolarEdge
StorEdge
-Single
Battery/High
Capacity
Installation
MAN-01-00283-
1.1
22
Chapter 4: Installing the Backed-up Loads Panel and Meter