7
SAFETY INSTRUCTIONS
2.2 GENERAL SAFETY INSTRUCTIONS
- Before starting the machine, please check the
machine is in good condition for work and is
safe for road use.
- Check that visibility is clear around the ma-
chine and there is no person in the working
area.
- In thoroughfare, please observe traffic signs
and regulations.
- It is forbidden to ride on the machine or
climb into the machine when it is running.
- Before using the machine, the user must be
familiar with all operating
elements.
- Please be extremely careful when coupling
and uncoupling the machine to the tractor.
- Please check that the PTO shaft is in good
condition and well protected. Prevent the
protective tube from turning by holding both
the tube and chain provided for this purpo-
se.
- Mount the PTO shaft’s transmission only when
the tractor’s engine is off.
- Before connecting the PTO shaft, be sure that
the danger zone surrounding the machine is
clear.
- Never leave the tractor’s driver’s seat while the
machine is in operation.
- Do not deposit external elements inside the
hopper.
- When mantaining the hydraulic system of the
seed driller, make sure that it is depressurised
and the tractor’s engine is off.
- Please regularly check the condition of the
tubes and hosepipes in the hydraulic system.
These parts age naturally and their life should
not surpass 6 YEARS. Please replace when ne-
cessary.
- When transiting with the sowing equipment
raised, block the lowering switch. Before lea-
ving the tractor, lower the support feet, lower
the sowing equipment onto the ground and
remove the tractor’s starting key.
-
Always use enough supporting elements
when maintaining the machine in a raised po-
sition to prevent the machine from lowering
or falling.
- Before planting, evaluate the potential risks
in the area such as very steep slopes, possi-
ble contact with overhead power lines due to
uneven floors and/or configuration of moving
parts of the machine.
2.3 LOADING AND UNLOADING INSTRUCTIONS
- THESE OPERATIONS SHOULD BE PERFORMED
ONLY BY QUALIFIED AND EXPERIENCED PER-
SONNEL.
- LOADING AND UNLOADING THE MACHINE MUST
BE PERFORMED, IF POSSIBLE, USING A BRIDGE
CRANE.
- WHEN THE PLANTER IS DELIVERED, IT SHOULD
BE IMMEDIATELY CHECKED TO DETECT POS-
SIBLE DAMAGES DURING TRANSPORTATION
OR MISSING PIECES. ONLY THE IMMEDIATE
REPORTING OF THIS TO THE DELIVERER WILL
RESULT IN COMPENSATION.
Summary of Contents for A-6000/NS PLUS
Page 38: ...38 DOSAGE CHART ...
Page 40: ...40 GUARANTEE ...
Page 41: ...41 NOTES 13 NOTES DATE NOTES ...
Page 42: ...42 NOTES DATE NOTES ...
Page 43: ...43 NOTES ...