HYD 3K~6K-EP
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
- 2 -
installing electrical devices. And assure there is enough fire exit space, convenient
for maintenance. Maintain proper ventilation to ensure enough air cycle to cool the
inverter.
Transport requirements
If you find packing problems that may cause the damage of the inverter, or find any
visible damage, please immediately notice the responsible transportation company.
You can ask solar equipment installation contractor or Shenzhen SOFARSOLAR
Co. Ltd. for help if necessary.
Transport of the equipment, especially by road, must be carried out with by suitable
ways and means for protecting the components (in particular, the electronic
components) from violent shocks, humidity, vibration, etc.
Labels on the equipment
Electric connection
Please comply with all the current electrical regulations about accident prevention
in dealing with the solar invert.
Before the electrical connection, make sure to use opaque material
to cover the PV modules or to disconnect PV array DC switch.
Exposure to the sun, PV array will produce a dangerous voltage!
Danger
The labels must NOT be hidden with objects
and extraneous parts (rags, boxes, equipment,
etc.); they must be cleaned regularly and kept
visible at all times.