Page 3 - 5
TL49J
SERVICE AND REPAIR
the charger as the current drawn from the motor is higher than the output from the charger. It is im-
portant to cool the machine for 5 minutes to prevent the motor from being overloaded.
MAINTENANCE SCHEDULE
GENERAL
A well maintained machine will provide years of trouble free operation. It is important to carry out set
out checks of the machine’s structure and component prior to use or when set up for transportation.
Note
All machines operated in the UK must have a thorough inspection carried out every 6 months in ac-
cordance with LOLER regulations 1998 and a Certificate of Thorough Inspection produced by a com-
petent person. Contact Snorkel for further details.
OPERATOR’S RESPONSIBILITY
It is the responsibility of the operator to ensure that the machine is safe to use. To do so, all the daily
checks provided should be performed prior to operating the machine. The weekly and 6 monthly
period checks should be performed for maintenance purposes.
The information on the maintenance schedule are set to cover most eventualities. If further advice
is needed, contact Snorkel or its local representative.
Note
If this manual was not issued with the machine, check for updates and revisions from Snorkel or its
local representative. Failure to maintain the machine as specified will invalidate the warranty.
!
W A R N I N G
!
Always ensure the machine is in good, sound and undamaged condition.
When carrying out maintenance and repairs. Always clean the machine
thoroughly. Take care not to steam the batteries or the electrical
components.