39
EEWB334A
5-36
5-37
5-38
5-39
5-40
26
26
Fig. 5-36 OPTIMIZATION “OP.2”
START is signaled on the screen.
—
Spin the wheel
A compensation run is performed.
The screen “OP.3” as shown in
Fig. 5-37
is displayed.
Fig. 5-37 OPTIMIZATION “OP.3”
—
Mount the tire correctly on the rim and infl ate
to specifi ed infl ation pressure (make sure the
mounting guide rim of the tire is correctly seated).
—
Confi rm by pressing menu key 26.
The OPTIMIZATION “OP.4” screen (Fig. 5-38) is
displayed.
Fig. 5-38 OPTIMIZATION “OP.4”
(fi rst measuring run of tire/rim assembly)
—
Clamp the wheel on the balancer.
—
Readjust the wheel such that the valve is exactly
perpendicular to and above the main shaft.
—
Enter the valve position by pressing menu key 26.
The OPTIMIZATION “OP.5” screen (
Fig. 5-39
) is
displayed.
Fig. 5-39
OPTIMIZATION “OP.5”
START is signalled on the screen.
—
Perform the measuring run.
A measuring run is performed.
The OPTIMIZATION “OP.6” screen (
Fig. 5-40
) is
displayed.
Summary of Contents for EEWB334A
Page 2: ...2 EEWB334A ...
Page 63: ...63 EEWB334A ...
Page 66: ...66 EEWB334A ...
Page 127: ...127 EEWB334A REMARQUES ...
Page 130: ...130 EEWB334A ...