GT INSTALLATION AND OPERATION INSTRUCTIONS
Page 32
WALL HUNG CONVERSION
This boiler is certifi ed to be either mounted on the fl oor
as supplied, or mounted on a wall.
For wall mounting, perform the following steps.
1. Ensure that the desired location provides adequate
room for the clearance, see Table 1, venting, and
servicing.
2. Remove the right stainless steel panel, and
discard.
3. You will see that underneath the panel, the boiler frame
has mounting holes, designed for wall attachment.
4. The boiler must be mounted so the lag bolts enter
the studs of the wall. If this is not possible use a 3/4"
thick of plywood approximately
24 in
,
610 mm
, wide
by
36 in
,
914 mm
, high.
5. Install two #14-3" lag bolts three quarters of the
way into the surface, to the height you desire for
mounting.
6. Lift the boiler onto the wall, and tighten the top lag
bolts.
7. Once the unit is level, install the bottom two #14-3"
lag bolts.
8. Remove the Air Inlet Pipe assembly and Metering
elbow from the gas valve-venturi assembly, Figure
44.
Figure 44 - Air Inlet Pipe Removal
9. Remove the two screws attaching the gas valve-
venturi assembly to the side of the blower and rotate
the valve 90° so the 1/2" threaded connection is
pointing down, Figure 45. Pay close attention to how
the cork gasket is aligned.
Figure 45 - Gas Valve Rotation
10. Reattach the gas valve-venturi assembly to the side
of the blower making sure the gasket is correctly
orientated.
11. Re-install the Air Inlet Pipe assembly and Metering
elbow from the gas valve-venturi assembly, in the
vertical position, Figure 46.
Figure 46 - Air Inlet Pipe Installation
12. Install the gas line as per Figure 47 and follow
the instructions in the GAS PIPING section of this
manual.
Figure 47 - Gas Supply Piping
out
out
outou
t
1/2 IN THREADED
CONNECTION
REMOVE SCREWS
AND ROTATE 90°
RE-INSTALL SCREWS
IN NEW LOCATIONS
NEW LOCATIONS
FOR SCREWS
Summary of Contents for GT-150
Page 19: ...GT INSTALLATION AND OPERATION INSTRUCTIONS Page 19 Figure 30 Multiple 4 Wire Zone Valves...
Page 22: ...GT INSTALLATION AND OPERATION INSTRUCTIONS Page 22 Figure 33 Boiler Ladder Diagram...
Page 23: ...GT INSTALLATION AND OPERATION INSTRUCTIONS Page 23 Figure 34 Boiler Connection Diagram...
Page 40: ...WESTCAST INC 260 NORTH ELM STREET WESTFIELD MA 01085 TEL 413 562 9631 FAX 413 562 3799...