ALC404 LIGHTING TOWER CONTROLLER USER MANUAL
ALC404 Lighting Tower Controller 2018-11-06 Version 1.1 Page 71 of 83
8.6
CONTROLLER INFORMATION
Controller information page displays release information (software/hardware version and issue date),
boot screen and input/output ports status.
9 COMMISSIONING
Please make the under procedures checking before commissioning,
─
Ensure all the connections are correct and wires diameter is suitable.
─
E
nsure that the controller DC power has fuse, controller’s positive and negative connected to start
battery are correct.
─
Take proper action to prevent engine to crank disconnect (e. g. Remove the connection wire of fuel
valve). If checking is OK, make the start battery power on; choose manual mode and controller will
executive routine.
─
Set controller under manual mode, press ―start‖ button, genset will start. After the cranking times as
setting, controller will send signal of
Start Fail
; then press ―stop‖ to reset controller.
─
Recover the action of prevent engine start (e. g. Connect wire of fuel valve), press start button again,
genset will start. If everything goes well, genset will normal run after idle running (if idle run be set).
During this time, please
watch for engine’s running situations and AC generator’s voltage and
frequency. If abnormal, stop genset running and check all wires connection according to this manual.
Any other questions please contact technical personnel of factory in time.