13 Decommissioning the Inverter
SMA Solar Technology AG
Operating manual
SHP-US-20-BE-en-10
84
9. Dismantle the connecting plate. To do so, unscrew
the three screws (TX40).
2
1
3x
10. Position the enclosure lid and first tighten the upper-
left and lower-right screws, and then the remaining
screws crosswise (TX25, torque: 6 Nm ± 0.3 Nm
(53 in-lb ± 2.65 in-lb)).
2
1
12x
10x
11. Screw the transport handles as far as they will go
into the taps on the right- and left-hand side until
they lie flush with the enclosure. When doing so,
ensure that the transport handles are screwed into
the taps so that they are perfectly straight. If the
transport handles are not screwed in straight, this
can make it more difficult or even impossible to
unscrew them later on and can damage the taps to
the extent that transport handles can no longer be
screwed into them.
4x
12. Insert a screwdriver into the holes in the transport
handle and turn the screwdriver through 90°. This
ensures that the transport handles are securely
tightened.
90°
4x
13. If the inverter is to be hooked into the mounting brackets by means of a hoist, screw the eye
bolts into the threads on the top of the inverter and attach the hoist to them. The hoist must be
suitable to take the weight of the inverter.
14. Unscrew the screw for securing the product to the
mounting brackets on the right and left (TX40).
Summary of Contents for SHP 125-US-20
Page 95: ......
Page 96: ...www SMA Solar com...