
19
SJ519 TH
216942AC
Scheduled Maintenance Inspections
Section 1 – Scheduled Maintenance
1.5-8 Boom -
A
▪
Ensure there are no loose or missing parts and
there is no visible damage.
▪
Ensure all bolts and pins are properly tightened.
▪
Ensure there are no visible cracks in welds or
structure and there are no signs of deformation.
▪
Ensure all hoses are properly tightened and
there is no evidence of hydraulic leakage.
1
Slide Pads -
B, C, D
▪
Ensure all bolts are tight, there is no visible
damage to the slide pads and that no parts are
missing.
2
Boom Angle Indicator -
A
▪
Ensure all bolts are tight, and there is no
visible damage and indicator swings freely.
1.5-9 Lifting Attachment
-
A
3
Ensure attachment is properly positioned and
secured.
▪
Ensure there are no loose or missing parts and
there is no visible damage.
1.5-10 Grease Points -
B
Maintaining properly greased components is
essential for good performance and service life of the
telehandler. If components are improperly greased, it
could result in component damage.
4
Greased component locations
WARNING
Ensure that there are no personnel or obstructions
in maintenance area.
Greasing intervals are based on average telehandler
usage. Use of telehandler may vary significantly
and greasing frequency must be adjusted to obtain
maximum service life.
Refer to the Daily & Weekly Maintenance Chart
located inside operator’s cab for grease points
location and service intervals.
1
3
4
2
Summary of Contents for SJ519 TH
Page 1: ...SERVICE MANUAL 216942AC October 2020 ANSI SJ519 TH TELEHANDLERS...
Page 4: ...4 SJ519 TH 216942AC Notes...
Page 22: ...22 SJ519 TH 216942AC Section 1 Scheduled Maintenance Function Tests...
Page 23: ...23 SJ519 TH 216942AC Section 2 Maintenance Tables...
Page 34: ...34 SJ519 TH 216942AC Notes...
Page 35: ...35 SJ519 TH 216942AC Section 3 System Component Identification and Schematics...
Page 40: ...40 SJ519 TH 216942AC Notes...
Page 107: ......
Page 108: ...www skyjack com...