※
For safety issue, we strongly advise to have 2 technicians work together to install.
1. Unscrew screws
①
, and move the Band Feeding Detector
②
outward. (move with caution, do not damage the
wire of the detector)
2. Install Band Feeder System
④
onto the table, matching to the position
⑤
.
5. Check the height of the Auto Kit
Before connecting the power and air, press the band clamper to avoid bumping into other parts
①
.
Push the feeding plate
②
toward the sewing machine until the surface
③
is the even with the needle plate
④
.
When
③
is lower than
④
(more than 0.3mm), or
③
is higher than
④
(more than 0.5mm), loosen the screw
⑤
,
and adjust screw
⑥
for the proper height.
3. Apply screws to join the Band
Feeder System
④
and Band
Feeding Detector
②
.
4. Connect all plugs and make sure
they are secured.
INSTALLATION
④
④
①
⑤
③
②
①
②
P2
Summary of Contents for ASP-EBJ100
Page 1: ...ASP EBJ100 INSTRUCTIONS BOOK PARTS LIST ORIGINAL...
Page 2: ......
Page 3: ...ENGLISH ENGLISH...
Page 33: ...P5...
Page 34: ...P6...
Page 35: ...P7...
Page 36: ...P8...
Page 37: ...P9...
Page 38: ...P10...
Page 39: ...P11...
Page 40: ...P12...
Page 41: ...P13...
Page 42: ...P14...
Page 43: ...P15...
Page 44: ...P16...
Page 45: ...P17...
Page 46: ...P18...
Page 47: ...P19...
Page 48: ...P20...
Page 49: ...P21...
Page 50: ...P22...
Page 51: ...P23...
Page 52: ...P24...
Page 53: ...P25...
Page 54: ...P26...
Page 55: ...P27...