background image

57

4.1

GAS VALVE

The 

“RS”

boilers come equipped stan-

dard  with  a  HONEYWELL gas  valve
with  the  following  attachment  diame-
ters (fig. 17):
–V4085A  1”  models  fr om

“RS

6÷10”

;

–V4085A  1

1

/

2

”  models  from 

“RS

11÷14”

.

NOTE: On the slow-opening regulator
(accelerator  5)  there  is  a  seal  that
must  not  be  tampered  with  in  any
way;  otherwise  the  valve  warranty
will be rendered null and void.

4.1.1

Rectified connector

The  electric  operator  of  the  valve
V4085 is supplied by a rectified con-
nector  (code  6243600),  which,  in
the  event  of  breakage,  must  be
replaced.  To  replace  it,  follow  the
instructions of fig. 18.

4

USE AND MAINTENANCE

KEY
1 Electric operator
2 Pressure-regulator coil
3 Pressure inlet
4 Attachment flanges
5 Slow-opening regulator 

(accelerator)

Fig. 17

KEY
1 Electric operator
2 Rectified connector

Fig. 18

5000

10000

19000

15000

26000

100

300

500

700

p in mm H

2

O

PORTATA in l/h

1

2

3

4

5

6

7

8

9

1

RS 107 - RS 6

2

RS 129 - RS 7

3

RS 151 - RS 8

4

RS 172 - RS 9

5

RS 194 - RS 10

6

RS 215 - RS 11

7

RS 237 - RS 12

8

RS 258 - RS 13

9

RS 279 - RS 14

Fig. 16

3.4

LOSS OF HEAD

FLOW RATE in l/h

Summary of Contents for RS 10

Page 1: ...RS IT ES GB PT...

Page 2: ...rge the system bleeding off the air present in the gas pipe by operating the pressure relief valve on the gas valve inlet Make sure that none of the regulation control and safety devices and appurtena...

Page 3: ...II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 Type B11 B11 B11 B11 B11 B11 B11 B11 B11 Maximum temperature C 95 95 95 95 95 95 95 95 95 Mains gas nozzles Quantity n 5 6 7 8 9 10 11 12 13 Meth...

Page 4: ...limiting pressure loss between the gas meter and any apparatus being used to not greater than 1 0 mbar for family II gases natu ral gas 2 0 mbar for family III gases butane or propane An adhesive data...

Page 5: ...must be at least 500 mm Access to the chamber must be guaranteed by means of an opening provided with an air tight metal door have a circular square or rectangu lar internal cross section in the case...

Page 6: ...pieces which are to be joined together using the screws provided fig 5 The smoke chamber is assembled by fastening the right hand side panel 2 to the top panel 1 using the nine hexagonal head self tap...

Page 7: ...l 6 and the panels 7 and 8 to the panel 9 by means of the pressure pins making sure that they are joined together using the two self tapping flathead screws 7SP x 1 2 provided assemble the panels 4 an...

Page 8: ...provided between the head and the intermediate section at the other end of the body NOTE Take the utmost care when assembling the two electrodes so as not to break the ceramic coating which otherwise...

Page 9: ...rough the SM 191 1 programmer and the gas valve opens at the same time Burner ignition normally takes place within 1 or 2 seconds However it is possible for ignition failures to occur with consequent...

Page 10: ...regu lating thermostat with a double con tact having differentiated setting This makes it possible to obtain a reduction of heat output before the burner goes out completely by means of the coil asse...

Page 11: ...4085 is supplied by a rectified con nector code 6243600 which in the event of breakage must be replaced To replace it follow the instructions of fig 18 4 USE AND MAINTENANCE KEY 1 Electric operator 2...

Page 12: ...e minimum posi tion until you hear the click of the first contact of the thermostat leave the knob in that position and turning the screw 4 seek the reduced pressure value according to Table 3 for the...

Page 13: ...upon first ignition or after long periods of lay off Check whether the rectifier card on the connector that supplies the gas solenoid valve is working properly If necessary replace Valve coil has a b...

Page 14: ...scharge cur rent to the ignition electrode and simul taneously opening the gas valve Ignition of the burner normally takes place within 1 or 2 seconds For various reasons the boiler may fail to start...

Page 15: ...y to convert to a different gas from that for which the boiler has been arranged get in touch exclusively by authorized technical staff CLEANING AND MAINTENANCE At the end of each heating season it is...

Reviews: