Sime RS 10 Installer'S Instructions Download Page 14

60

BOILER  IGNITION 

(fig. 1)

To  ignite 

“RS” 

boilers,  just  set  the

knob of the regulating thermostat (5)
to  60°C  and  press  the  main  switch
(1),  and  the  boiler  will  start  working
automatically.

CAUTION: 
When  the  gas  pressure  is  insuffi-
cient, the burner will immediately go
out,  and  the  equipment  “lock  out”
signal (6) will be activated along with
the red warning light for insufficient
gas pressure (2). 
Should  this  happen,  for  reasons  of
safety,  the  boiler  cannot  be  started
up again by pressing the equipment
deblocking button (6). 
The boiler will ignite again automati-

cally once the minimum pressure of
10  mbar  set  by  the  gas  pressure
switch is restored.

HEATING TEMPERATURE 
ADJUSTMENT

(fig. 1)

The heating temperature can be adju-
sted  by  turning  the  knob  of  the  ther-
mostat  (5),  which  has  a  range  of
between 40°C and 85°C. 
To  ensure  optimal  boiler  efficiency  at
all times, we recommend not to drop
below a minimum working temperatu-
re of 60°C. 
In  this  way,  any  formation  of  conden-
sate that might cause deterioration of
the  cast-iron  body  over  time  will  be
avoided.

DEBLOCKING OF ELECTRONIC 
EQUIPMENT

(fig. 1)

The 

“RS”

boilers are of the automatic

ignition type (without pilot). 
As a result, they are equipped with an
SM  191.1  control  and  protection  elec-
tronic programmer. 
When  the  main  switch  (1)  is  pressed,
the boiler will start operating, sending,
via  the  programmer,  a  discharge  cur-
rent to the ignition electrode and simul-
taneously opening the gas valve. 
Ignition  of  the  burner  normally  takes
place within 1 or 2 seconds.
For various reasons, the boiler may fail
to start, with consequent activation of
the equipment “lock out” signal. In this
case, press the push-button (6) for the
boiler to start up again automatically. 
If  after  two  or  three  deblocking
attempts,  the  equipment  does  not  go
through the ignition cycle correctly, call
the authorized technical staff.

TURNING OFF BOILER

(fig. 1)

To turn off the 

“RS”

boiler completely,

cut  off  electricity  supply  to  the  equip-
ment by operating the main switch (1). 
Close the gas-feed pipe tap if the boiler
remains inoperative for a long period.

SAFETY THERMOSTAT

The  safety  thermostat  (3  fig.  1)  is  of
the manually resetting type  and opens,
causing  the  main  burner  to  turn  off
immediately, whenever the temperatu-

WARNINGS

–In case of fault and/or incorrect equipment operation, deactivate it, without making any repairs or taking any direct

action. Contact the authorised technical staff.

–The installation of the boiler and any servicing or maintenance job must be carried out by qualified personnel. Under

no circumstances, the devices sealed by the manufacturer can be tampered with (pr EN 89).

–It  is  absolutely  prohibited  to  block  the  intake  grilles  and  the  aeration  opening  of  the  room  where  the  equipment  is

installed.

USER INSTRUCTIONS

LIGHTING AND OPERATION

Fig. 1

KEY
1 Main switch
2 Gas pressure 

warning light

3 Safety stat
4 Thermometer
5 Boiler stat
6 Lock-out reset button

Summary of Contents for RS 10

Page 1: ...RS IT ES GB PT...

Page 2: ...rge the system bleeding off the air present in the gas pipe by operating the pressure relief valve on the gas valve inlet Make sure that none of the regulation control and safety devices and appurtena...

Page 3: ...II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 II2H3 Type B11 B11 B11 B11 B11 B11 B11 B11 B11 Maximum temperature C 95 95 95 95 95 95 95 95 95 Mains gas nozzles Quantity n 5 6 7 8 9 10 11 12 13 Meth...

Page 4: ...limiting pressure loss between the gas meter and any apparatus being used to not greater than 1 0 mbar for family II gases natu ral gas 2 0 mbar for family III gases butane or propane An adhesive data...

Page 5: ...must be at least 500 mm Access to the chamber must be guaranteed by means of an opening provided with an air tight metal door have a circular square or rectangu lar internal cross section in the case...

Page 6: ...pieces which are to be joined together using the screws provided fig 5 The smoke chamber is assembled by fastening the right hand side panel 2 to the top panel 1 using the nine hexagonal head self tap...

Page 7: ...l 6 and the panels 7 and 8 to the panel 9 by means of the pressure pins making sure that they are joined together using the two self tapping flathead screws 7SP x 1 2 provided assemble the panels 4 an...

Page 8: ...provided between the head and the intermediate section at the other end of the body NOTE Take the utmost care when assembling the two electrodes so as not to break the ceramic coating which otherwise...

Page 9: ...rough the SM 191 1 programmer and the gas valve opens at the same time Burner ignition normally takes place within 1 or 2 seconds However it is possible for ignition failures to occur with consequent...

Page 10: ...regu lating thermostat with a double con tact having differentiated setting This makes it possible to obtain a reduction of heat output before the burner goes out completely by means of the coil asse...

Page 11: ...4085 is supplied by a rectified con nector code 6243600 which in the event of breakage must be replaced To replace it follow the instructions of fig 18 4 USE AND MAINTENANCE KEY 1 Electric operator 2...

Page 12: ...e minimum posi tion until you hear the click of the first contact of the thermostat leave the knob in that position and turning the screw 4 seek the reduced pressure value according to Table 3 for the...

Page 13: ...upon first ignition or after long periods of lay off Check whether the rectifier card on the connector that supplies the gas solenoid valve is working properly If necessary replace Valve coil has a b...

Page 14: ...scharge cur rent to the ignition electrode and simul taneously opening the gas valve Ignition of the burner normally takes place within 1 or 2 seconds For various reasons the boiler may fail to start...

Page 15: ...y to convert to a different gas from that for which the boiler has been arranged get in touch exclusively by authorized technical staff CLEANING AND MAINTENANCE At the end of each heating season it is...

Reviews: