Decommissioning/Storage
Instruction Manual OilGuard 2 W
14809E/2
77
12
Decommissioning/Storage
12.1
Decommissioning the OilGuard 2 W
The aim of decommissioning is to prepare the individual components of the system properly
for storage.
WORKSTEP
ADDITIONAL INFO / IMAGES
1.
Interrupt the service voltage to the OilGuard 2
W and remove the electrical connections.
Life-threatening voltage in-
side the instrument.
Connecting the electrical lines is
extremely dangerous. Parts of the
system can also be damaged. Lo-
cal regulations for electrical instal-
lations must be observed at all
times.
2.
Interrupt the sample feed to the OilGuard 2 W
and remove the inlet and outlet hose.
3.
All surfaces which come into contact with the
sample must be thoroughly cleaned.
4.
Remove the OilGuard 2 W from the measuring
point.
5.
Make sure that all covers are closed and all
locks on the OilGuard 2 W are locked.
12.2
Storing the components
There are no special requirements for storing the instruments. However, please note the
following information:
The system contains electronic components. Storage for such components must fulfill
the usual conditions. It is important to note that the storage temperature must be be-
tween -20 and +50 °C.
All components that come into contact with the medium during operation have to be
dry and clean for a long time before being put into storage.
The measuring equipment with all of the accessory parts must be protected against
weather factors, condensing humidity and aggressive gases during storage.