Table of contents
1FK7 G2 synchronous motors
8
Operating Instructions, 05/2021, A5E50907562B AA
4
Mounting ............................................................................................................................................. 53
4.1
Safety instructions ............................................................................................................. 53
4.2
Checklists prior to mounting .............................................................................................. 55
4.3
Mounting instructions........................................................................................................ 56
4.4
Mounting conditions ......................................................................................................... 58
4.4.1
Natural cooling .................................................................................................................. 58
4.4.2
Forced ventilation .............................................................................................................. 59
4.5
Mounting the drive elements ............................................................................................. 61
4.6
Vibration response ............................................................................................................. 63
5
Connecting .......................................................................................................................................... 65
5.1
Safety instructions ............................................................................................................. 65
5.2
Permissible line systems ..................................................................................................... 66
5.3
Motor circuit diagram ........................................................................................................ 66
5.4
System integration ............................................................................................................ 67
5.4.1
Connection notes .............................................................................................................. 67
5.4.1.1
Motor connection .............................................................................................................. 67
5.4.1.2
Rotating the connector at the motor .................................................................................. 69
5.4.1.3
Routing cables in a damp environment............................................................................... 73
5.4.1.4
Connection notes for motors with M03 and M39................................................................ 73
5.4.2
Connecting to a converter .................................................................................................. 79
5.4.3
Connecting the forced ventilation ...................................................................................... 81
5.4.4
Connecting the holding brake ............................................................................................ 83
5.4.5
Line connection ................................................................................................................. 85
5.4.6
Signal connection .............................................................................................................. 87
5.4.6.1
Motors with DRIVE-CLiQ interface ...................................................................................... 87
5.4.6.2
Connecting the RJ45 DRIVE-CLiQ connector ........................................................................ 89
5.4.6.3
Motors without a DRIVE-CLiQ interface ............................................................................... 93
5.4.6.4
Design of signal connectors ............................................................................................... 94
5.4.6.5
Connecting the signal line on a motor with forced ventilation ............................................ 95
6
Commissioning .................................................................................................................................... 97
6.1
Safety instructions ............................................................................................................. 97
6.2
Checklists for commissioning ........................................................................................... 100
6.3
Commissioning procedure ............................................................................................... 103
6.4
Switching on and switching off ........................................................................................ 104
7
Operation ........................................................................................................................................... 105
7.1
Safety instructions ........................................................................................................... 105
7.2
Switching on and off........................................................................................................ 106
7.3
During operation ............................................................................................................. 107
7.4
Stoppages ....................................................................................................................... 108
8
Faults and their rectification ............................................................................................................. 109
9
Maintenance ...................................................................................................................................... 111