13-1
Operator Panel OP3
Edition 11/99
Installation
The OP3 is suitable for control cabinets and consoles. For this, the front
panel must be provided with a mounting cutout (refer to section 15.1). The
front panel must not be thicker than 4 mm. No other drilled holes are
required for mounting.
The OP3 can also be used externally as a portable device.
!
Caution
S
Before the device is taken into service, it should be at room temperature.
In the event of moisture condensation, do not switch on the device until it
is completely dry.
S
The device underwent function testing before being delivered. Should a
fault still occur, enclose an exact description of the fault with the device
when you return it.
S
To prevent overheating of the OP3 in operation,
–
the device must not be exposed to direct sunlight (this also prevents
fading of the foil front) and
–
the ventilation slits in the device housing must remain free after
mounting.
S
Certain parts of the system which may be carrying dangerous current are
accessible after the system cabinet is opened.
Note
The IP65 degree of protection can be insured only when the gasket on the
front panel on the OP3 fits properly.
Mounting location
and requirements
13
Summary of Contents for SIMATIC HMI OP3
Page 12: ...iv Operator Panel OP3 Edition 11 99 Contents ...
Page 13: ...INTRODUCTION 1 Product Description 2 Functionality Part I ...
Page 14: ...2 2 OperatorPanel OP3 Edition 11 99 ...
Page 18: ...1 4 OperatorPanel OP3 Edition 11 99 Product Description ...
Page 22: ...2 2 OperatorPanel OP3 Edition 11 99 ...
Page 34: ...4 6 OperatorPanel OP3 Edition 11 99 Using the OP3 with Its Standard Functions ...
Page 38: ...5 4 OperatorPanel OP3 Edition 11 99 Screens ...
Page 42: ...6 4 OperatorPanel OP3 Edition 11 99 Password Protection ...
Page 48: ...7 6 OperatorPanel OP3 Edition 11 99 Messages ...
Page 56: ...10 4 OperatorPanel OP3 Edition 11 99 System Settings on Standard Screens ...
Page 74: ...12 12 Operator Panel OP3 Edition 11 99 Communication ...
Page 75: ...INSTALLATION AND COMMISSIONING 13 Installation 14 Commissioning Part III ...
Page 76: ...12 2 OperatorPanel OP3 Edition 11 99 ...
Page 82: ...13 6 OperatorPanel OP3 Edition 11 99 Installation ...
Page 86: ...14 4 OperatorPanel OP3 Edition 11 99 Commissioning ...
Page 88: ...14 2 OperatorPanel OP3 Edition 11 99 ...
Page 96: ...P 2 OperatorPanel OP3 Edition 11 99 ...
Page 98: ...A 2 OperatorPanel OP3 Edition 11 99 Brief Description of Standard Screens ...
Page 112: ...D 4 OperatorPanel OP3 Edition 11 99 ESD Guidelines ...
Page 120: ...Glossary 4 OperatorPanel OP3 Edition 11 99 Glossary ...