
Series commissioning and operation
8.2 Series commissioning and replacement of the frequency converter
ET 200pro FC
Operating Instructions, 07/2016, A5E01100763B AC
143
Standard commissioning sequence with MMC
1.
Configure all frequency converters to be involved in standard commissioning with the
same application ID.
2.
Commission the first frequency converter.
3.
Upload from frequency converter to an MMC: Frequency converter parameters are saved
on an MMC.
4.
Download from an MMC to the frequency converter: The saved parameters are
transferred to other frequency converters. The download can be performed manually or
automatically.
Note
In the case of a manual download, all the necessary parameters (with the exception of
fail-safe parameters) will be downloaded to the frequency converter.
See also
Summary of Contents for Simatic ET 200pro FC
Page 1: ......
Page 2: ......
Page 12: ...Table of contents ET 200pro FC 12 Operating Instructions 07 2016 A5E01100763B AC ...
Page 180: ...Appendix A 3 Standards ET 200pro FC 180 Operating Instructions 07 2016 A5E01100763B AC ...
Page 192: ...Glossary ET 200pro FC 192 Operating Instructions 07 2016 A5E01100763B AC ...
Page 195: ......
Page 196: ......