
Connecting and commissioning
9.2 Preparing the control unit
ATD4xxW Door Controller for Industrial Applications
262
System Manual, 01/2017, A5E38080677-AB
Overview of commissioning a door drive
We recommend the following initial commissioning procedure for a door drive:
Table 9- 1
Procedure for commissioning a door drive
Step
Procedure
Reference
1
Preparing the control unit
(Page 263) section
2
Connecting a geared motor to the control unit
the control unit (Page 264) sec-
tion
3
Connect relay outputs of the control unit (optional, only for
control units with relay outputs)
Relay module (Page 112) sec-
tion
4
Connecting the control unit to the fieldbus (optional, only
for controllers with the corresponding module):
•
USS
•
PROFIBUS
•
PROFINET
•
USS module (Page 116)
section
•
(Page 121) section
•
section
5
Connecting the power supply to the network and execut-
ing a learn run
Connecting the power supply to
6
Connecting digital input signals
Digital input signals (Page 267)
section
7
Commissioning the control unit on the fieldbus (optional,
only for control units with corresponding module)
Commissioning the control unit
on the fieldbus (Page 268) sec-
tion
8
Final settings and checks
(Page 271) section
Summary of Contents for SIDOOR ATD401W
Page 1: ......