Operating Instructions
| SICHARGE UC Dispenser UL
10.4 Testing the inside of the charging station
Maintenance interval
Testing every 12 months
Visual check of the inside
1. Check the charging socket for humidity, dust, and corrosion
2. Check for correct function:
– Relay
– Lights
– Other display elements
Mechanical check of the inside
1. Check the tightness of the connections L1, N, PE
2. Check the tightening torque of 45 Nm of the connections DC+, DC-, PE, and apply sealing paint
3. Check the fixing points of the base plate
WARNING
Qualified electrician
Only a qualified and trained electrician may work on the SICHARGE UC dispenser.
99