Mains connection and power supply
7-1
Checks before powering up the generator
On p.c. board D702:
1
Set switch S1(UZW) to "OFF" (lower position).
2
Set switch S2 (SS) to "OFF" (lower position).
3
Set switch S3 (TEST) to "ON" (upper position- output service PC).
Figure 1 P.C. board D702
Measuring the line resistance
See Figure 2
1
Remove fuses F10 (1) and F20 (2) or, when single-phase supply, fuse F10 (1).
2
Connect line resistance meter to fuse holders F10 and F20.
3
Mains supply "ON".
4
Carry out measurement.
5
Mains supply "OFF".
MAM00106
J39
J50
UZW
SS
TEST
S1
S2
S3
ZBL
AR
KVE
BRAKE
STATUS
VH
NSE1
NSE2
DS
SS
BS
GND
X990
X965
X962
X964
X961
X960
X963
IHREG
MAREG
X966
X968
X969
X702
R13
R11
R43
V6
V7
V1
V2
V3
V4
V5
X967
X980
X981
X982
X983
X984
X985