Installing the generator and the stand
4-3
Installing the cable ducts
1
Position the cable ducts (1) to the stand and the generator respectively.
2
Leave sufficient space, approx 10 mm between the cable ducts (1) and the base plate
of the stand (3) to allow for the mounting of the cable outlet cover (4).
3
Check that the cable duct (1) is slightly overlapped by the cable outlet cover (4).
Figure 3 Installing the cable ducts (top view)
4
Mark the outlines of the cable ducts (1) on the floor.
5
Cut the bottom of the cable ducts (6) and the cable duct cover (5) to proper length.
NOTE!
Figure 3 shows a right- angled installation of the cable ducts. If the generator is to be in-
stalled at an other angle to the stand, you just have to cut the cable ducts correspondingly.
6
Fasten the bottom plate of the cable ducts (6) to the floor according to marking, using
double-sided adhesive tape.
7
Cover the cable entry at the generator that is not used with the enclosed cover plate
(7).
MAM00089
1
5
7
4
3
6
1
10 mm