
Mounting / Installation
Switch flame detector over to collective operation
5
40 | 66
Building Technologies
007011_m_en_--
Fire Safety
2018-06-28
3. Connect the connection cable supplied (1) to the connections (3) in the base
for flame detector and on the flame detector.
4. Wait around 15 seconds and then remove the connection cable and source of
DC voltage.
a
The flame detector is switched over to collective operation and can be
connected to a collective detector line.
Figure 14: Connection diagram for the source of DC voltage
Figure 15: Switching flame detector over to collective operation
1 Connection cable
3 Connection for connection cable
2 Bridging connector
LINE
+
+
_
_
+
_
_
+
1
2
3