![Siemens 1NB1402-2AA84-4CA0-Z Operating And Installation Instructions Download Page 89](http://html.mh-extra.com/html/siemens/1nb1402-2aa84-4ca0-z/1nb1402-2aa84-4ca0-z_operating-and-installation-instructions_378967089.webp)
9.3.3
First service after installation or repair
● Check after approx. 500 operating hours, but after not more than one year:
Check
When the
motor is
running
At stand‐
still
The electrical parameters are maintained.
X
The permissible bearing temperatures are not exceeded.
X
The smooth running characteristics and machine running noise have not
deteriorated.
X
The foundation has no cracks or indentations. (*)
X
X
(*) You can perform these checks while the motor is at standstill or, if required, while running.
● Further checks may be required if so specified in operating instructions of components
(Page 149) or in accordance with the plant-specific conditions.
● If you find any deviations during the inspection, you must rectify them immediately. They
may otherwise damage the motor.
9.3.4
General inspection
● Check that the installation conditions are observed. Perform the following checks after
approx. 16 000 operating hours or at the latest after two years:
Checking
When the
motor is
running
At stand‐
still
The electrical parameters are maintained
X
The permissible bearing temperatures are not exceeded
X
The smooth running characteristics and machine running noise have not
deteriorated
X
The foundation has no cracks or indentations. (*)
X
X
The machine is aligned within the permissible tolerance ranges.
X
All the fixing bolts/screws for the mechanical and electrical connections
have been securely tightened
X
All the potential connections, grounding connections and shield supports
are correctly seated and properly bonded
X
The winding insulation resistances are sufficiently high (Page 40)
X
Any bearing insulation is fitted as shown on the plates and labels
X
The CABLES and insulating parts and components are in good condition
and there is no evidence of discoloring
X
Condensation can freely flow away.
X
(*) This check can be made at standstill or when running.
● If you detect any deviations during the inspection, you must rectify them immediately. They
may otherwise cause damage to the machine.
Maintenance
9.3 Inspection and maintenance
SIMOTICS HV C 1NB1402-2AA84-4CA0-Z
Operating Instructions 06/2018
89
Summary of Contents for 1NB1402-2AA84-4CA0-Z
Page 2: ...26 06 2018 15 34 V3 00 ...
Page 10: ...Table of contents SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 10 Operating Instructions 06 2018 ...
Page 22: ...Description SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 22 Operating Instructions 06 2018 ...
Page 84: ...Operation 8 9 Faults SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 84 Operating Instructions 06 2018 ...
Page 112: ...Service and Support SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 112 Operating Instructions 06 2018 ...
Page 117: ...117 ...
Page 118: ...118 ...
Page 119: ...119 ...
Page 120: ...120 ...
Page 121: ...121 ...
Page 122: ...122 ...
Page 123: ...123 ...
Page 124: ...124 ...
Page 125: ...125 ...
Page 126: ...126 ...
Page 127: ...127 ...
Page 128: ...128 ...
Page 129: ...129 ...
Page 130: ...130 ...
Page 133: ...133 ...
Page 148: ...148 ...
Page 150: ...Additional documents SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 150 Operating Instructions 06 2018 ...
Page 154: ...Index SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 154 Operating Instructions 06 2018 ...
Page 155: ...AF Einbauerklärung Loher LDX U157 AJ EC Declaration of Conformity U161 ...