5.1
Preparations for installation
5.1.1
Requirements for installation
The following requirements must be satisfied prior to starting installation work:
● Staff have access to the relevant installation instructions and operating instructions.
● The machine is unpacked and ready for mounting at the installation location.
Note
Further Information
Further machine-specific information for installation can be found in Chapter "Technical
data and drawings" (Page 113).
Note
Measure the insulation resistance of the winding before starting installation work
Measure the insulation resistance of the winding before starting any installation work. If the
insulation resistance lies below the specified value, take appropriate remedial measures.
These remedial measures may necessitate the machine being removed again and
transported.
See also
Insulation resistance and polarization index (Page 40)
Damage to mounted parts and components as a result of high temperatures
The motor components get very hot during operation. High temperatures can damage parts
mounted by customers, such as cables manufactured out of materials that are not heat
resistant.
● Temperature-sensitive parts must not come in contact with or be attached to components
mounted on the machine.
● Only use heat-resistant mounting parts. The connecting cables and cable entries must be
suitable for the particular application.
5.1.2
Insulation resistance and polarization index
Measuring the insulation resistance and polarization index (PI) provides information on the
condition of the machine. It is therefore important to check the insulation resistance and the
polarization index at the following times:
● Before starting up a machine for the first time
● After an extended period in storage or downtime
● Within the scope of maintenance work
Assembly
5.1 Preparations for installation
SIMOTICS HV C 1NB1402-2AA84-4CA0-Z
40
Operating Instructions 06/2018
Summary of Contents for 1NB1402-2AA84-4CA0-Z
Page 2: ...26 06 2018 15 34 V3 00 ...
Page 10: ...Table of contents SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 10 Operating Instructions 06 2018 ...
Page 22: ...Description SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 22 Operating Instructions 06 2018 ...
Page 84: ...Operation 8 9 Faults SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 84 Operating Instructions 06 2018 ...
Page 112: ...Service and Support SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 112 Operating Instructions 06 2018 ...
Page 117: ...117 ...
Page 118: ...118 ...
Page 119: ...119 ...
Page 120: ...120 ...
Page 121: ...121 ...
Page 122: ...122 ...
Page 123: ...123 ...
Page 124: ...124 ...
Page 125: ...125 ...
Page 126: ...126 ...
Page 127: ...127 ...
Page 128: ...128 ...
Page 129: ...129 ...
Page 130: ...130 ...
Page 133: ...133 ...
Page 148: ...148 ...
Page 150: ...Additional documents SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 150 Operating Instructions 06 2018 ...
Page 154: ...Index SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 154 Operating Instructions 06 2018 ...
Page 155: ...AF Einbauerklärung Loher LDX U157 AJ EC Declaration of Conformity U161 ...