Filling with oil for the first time
Alternative permissible greases
Esso Unirex N3
Exxon Mobil Mobilgrease XHP 103
Shell Gadus S5 V100 2
Shell Gadus S3 T100 2
BP Energrease SY2202
Castrol Firetemp XT2
Chevron Grease SRI2
Klüber Petamo GHY 133N
SKF LGHP 2
Exxon Mobil Polyrex EM
Observe the following when changing over to an alternative type of grease that is permitted according
to the table:
Bearings with permanent lubrication:
● Completely remove the old grease from the bearing before regreasing it.
● Fill roller bearings completely with grease and cavities in the bearing cover only up to one
third.
Bearings with regreasing:
If complete replacement of grease and cleaning of the bearing is not possible, keep the
operating time to a minimum when different greases are mixed. To do this, thoroughly grease
the bearing when the machine is running with about twice the amount of grease until spent
grease has been removed from the greasing ducts. Then regrease 4x at intervals of ¼ of the
normal greasing interval. During this time, very carefully monitor the bearing locations involved.
Then resume the normal greasing intervals.
NOTICE
Damage due to mixing grease types
If you mix greases and oils with different soap or oil bases, then the lubricating properties
may no longer be guaranteed.
Mixing low-temperature grease with normal temperature grease can cause lumps to form in
the lubricant. The consequence can be damage to the roller bearings due to overheating.
Never mix greases that have different thickening agents and different base oils.
9.3.7
Removing spent grease
If the specifications on the lubricant plate are observed, the spent grease chamber will provide
capacity for a calculated service life of at least 40 000 operating hours, approx. five years.
When the spent grease chamber is full, the spent grease must be removed prior to
Maintenance
9.3 Inspection and maintenance
SIMOTICS HV C 1NB1402-2AA84-4CA0-Z
Operating Instructions 06/2018
91
Summary of Contents for 1NB1402-2AA84-4CA0-Z
Page 2: ...26 06 2018 15 34 V3 00 ...
Page 10: ...Table of contents SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 10 Operating Instructions 06 2018 ...
Page 22: ...Description SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 22 Operating Instructions 06 2018 ...
Page 84: ...Operation 8 9 Faults SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 84 Operating Instructions 06 2018 ...
Page 112: ...Service and Support SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 112 Operating Instructions 06 2018 ...
Page 117: ...117 ...
Page 118: ...118 ...
Page 119: ...119 ...
Page 120: ...120 ...
Page 121: ...121 ...
Page 122: ...122 ...
Page 123: ...123 ...
Page 124: ...124 ...
Page 125: ...125 ...
Page 126: ...126 ...
Page 127: ...127 ...
Page 128: ...128 ...
Page 129: ...129 ...
Page 130: ...130 ...
Page 133: ...133 ...
Page 148: ...148 ...
Page 150: ...Additional documents SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 150 Operating Instructions 06 2018 ...
Page 154: ...Index SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 154 Operating Instructions 06 2018 ...
Page 155: ...AF Einbauerklärung Loher LDX U157 AJ EC Declaration of Conformity U161 ...