
26
8019897/V2-0/2017-12| SICK
O P E R A T I N G I N S T R U C T I O N S | PowerCEMS100
Subject to change without notice
5
INSTALLATION
5.2
Inserting the NO
x
converter cartridges (option)
▸
Check that the catalyzer cartridge is inserted in the NO
x
converter.
Normally, the converter fitted in the PowerCEMS100 analysis system is delivered with
the catalyzer cartridge already fitted and ready for operation.
5.3
Preparing the gas sampling probe
5.4
Gas lines
The gas connections for the standard PowerCEMS100 system cabinet are located on the
top of the system cabinet.
Note
▸
Observe local regulations on installing gas cylinders.
▸
Provide a suitable installation location for the pressure control unit.
WARNING
HAZARD BY HOT SURFACES ON THE CONVERTER AND CATALYZER
CARTRIDGE
Serious injuries through burns.
▸
Wear protective gloves.
▸
Secure components against unauthorized access.
Observe the Operating Instructions / Assembly Instructions for the gas
sampling probes when preparing for installation or commissioning.
WARNING
HAZARD BY OVERPRESSURE IN THE GAS DUCT
Serious injuries.
▸
Set the pressure via the pressure control valve.
Note
The system-specific version of the PowerCEMS100 system cabinet may vary,
refer to the view drawings in the Technical System Documentation.