
5.3
Material required......................................................................................
5.4
Preparing the sampling point...................................................................
5.5
GM700 Ex scope of delivery....................................................................
5.6
Installation sequence...............................................................................
5.6.1
Installation example................................................................
5.6.2
Overview of installation steps (duct-side preparation)..........
5.6.3
Installing the flange with tube.................................................
5.6.4
Install the evaluation unit........................................................ 31
5.6.4.1
Install the FS840....................................................
5.6.5
Installing the purge air unit.....................................................
6
Electrical installation........................................................................ 34
6.1
Electrical installation safety information.................................................
6.2
Connection overview................................................................................
6.2.1
Lines.........................................................................................
6.3
Connecting interfaces .............................................................................
6.3.1
Connect I/O interfaces............................................................
6.3.1.1
GM700 Ex 3G terminal connection diagram........
6.3.1.2
Electrical connection of the evaluation unit EvU..
6.4
Connecting the connecting hose to the SR-unit on the EvU..................
6.5
Connecting pressure, temperature and purge air monitor ...................
6.6
Preparing the power supply...................................................................... 41
6.7
Connecting the FS840 Ex overpressure control.....................................
6.8
Electrical connection of SR-unit...............................................................
6.9
Connecting the potential equalization.....................................................
6.9.1
Connecting the potential equalization on the SR-unit...........
6.9.2
Connecting the potential equalization on the measuring
probe........................................................................................
6.9.3
Potential equalization - evaluation unit and Ex control unit..
7
Commissioning.................................................................................. 47
7.1
Safety information on commissioning.....................................................
7.2
Prerequisites for successful commissioning..........................................
7.3
Material required .....................................................................................
7.4
Overview of commissioning steps...........................................................
7.5
7.6
Fitting the SR-unit on the measuring probe............................................
7.7
Aligning the measuring probe in flow direction......................................
7.8
Feeding protective gas.............................................................................
7.8.1
Connecting the protective gas on the SR-unit.......................
7.8.2
Switch the pressurized enclosure on......................................
7.9
Optical fine alignment of the sender/receiver unit ...............................
7.10 Installing the weatherproof cover ...........................................................
7.11 Starting measuring operation..................................................................
7.11.1
Operating states......................................................................
7.11.2
Select the ambient temperature range..................................
CONTENTS
4
O P E R A T I N G I N S T R U C T I O N S | GM700 Ex
8019532/100Q/V1-1/2018-08 | SICK
Subject to change without notice