SOCIETA’ ITALIANA COSTRUZIONI ELETTRONICHE S.r.l.
VIA TAZIO NUVOLARI, n° 53 - 55061 CARRAIA - (LU)
W e b s i t e : w w w . s i c e t e l e c o m. i t
ISCRIZ. TRIBUNALE LUCCA N. 8661 - C.C.I.A.A. N. 103668
P. IVA 00871160461 - Tel. 0583 980787 - Fax 0583 981495
E - M a i l : i n f o @ s i c e t e l e c o m. i t
Observe if patient’s chest heaves. This second method can be used instead of the first even
when the patient’s nose is not obstructed, provided his nose is kept closed by pressing the
nostrils together by using the hand you were holding his head with.
The patient’s head must be kept sloping backwards as much as possible.
Figure 6-24: Artificial respiration procedure (4/4)
6. Start with ten rapid expirations, hence continue at a rate of twelve/fifteen expirations per
minute. Go on like this until the patient has regained consciousness, or until a doctor has
ascertained his death.
6.3.
Treatment of Burns
This treatment should be used after the patient has regained consciousness. It can also be
employed while the artificial respiration is being applied (in this case, there should be at least two
persons present).
Important:
– Do not attempt to remove his clothing from the burnt parts.
– Apply dry gauze on the burns.
– Do not apply ointments or other oily substances.
6.4.
Safety Rules
6.4.1. General Rules
Before carrying out any installation, turn–on, tests & operation and maintenance operations
carefully read the related Handbooks.
When equipment is operating nobody is allowed to have access inside on the equipment parts
which are protected with Cover Plate Shields removable with tools.
In case of absolute need to have access inside, on the equipment parts when it is operating this is
allowed exclusively to properly trained personnel.
For the eventual cleaning of the external parts of the equipment, absolutely do not use any
inflammable substance or substances which in some way may alter the markings, inscriptions etc.
It is recommended to use a slightly wet cleaning cloth.
Whenever the safety protection features have been impaired, REMOVE POWER.
To cut off power proceed to switch off the power supply units as well as cut off power station
upstream (rack or station distribution frame).