![Shimadzu AUW120 Instruction Manual Download Page 105](http://html1.mh-extra.com/html/shimadzu/auw120/auw120_instruction-manual_1256952105.webp)
92
15. Maintenance and Transport
15.2 Transport
1
Place hands on the main body as shown in the
figure.
2
Lift the main body slowly with the fingers
inserted beneath the bottom of it.
When moving by hand
…
Remove the anti-draft ring, the pan, and the pan supporter from
the weighing chamber. Lift the main body as shown in the figures
and carry it securely in both hands.
When using other methods
of transport
…
Use the packing box in which the balance was delivered.
Caution
This is a precision instrument. Handle with care and
never give any impact.
Note
Using a verified balance as a legal measuring instrument in the EU:
Span calibration must be newly performed (refer to
) after the balance
has been moved and re-installed, before using the balance as a legal mea-
suring instrument in the EU.
O/T
1d
/10d
UNI
T
PO
WE
R
B R K
C A
L
MENU