Unpacking
Due to the size and weight of the
Post Driver, two people are required
for the assembly procedures.
The Post Driver is shipped in several sections:
the drive ram assembly, base plate assembly,
short channel bracket, hose and valve carton,
safety arm carton, and the tilt cylinder carton.
Before starting the unpacking
procedure, make sure the
overhead lifting device or material
handling device (forklift) has
adequate lifting capacity. Follow all safety
recommendations when unpacking the Post
Driver. Some components are heavy and
can cause serious injury or death if not
adequately supported during removal and
assembly.
For ease of assembly, unload the Post Driver
components in the area where they will be
assembled. Choose a large, hard surface
area that can safely support the weight of the
assembled Post Driver and is accessible by
the machine it will be mounted on.
Assembly
NOTE
: Refer to the Service Parts section of
this manual for a photograph and description
of all the Post Driver parts.
The HD-12-H Post driver main carriage
channel has provisions for mounting the short
channel bracket in various positions. The
HD-12-H is shipped with the short channel
bracket bolts installed in the middle (most
common) mounting position. If an optional
mounting position is used, the three point hitch
weldment and stabilizer leg height will have to
be adjusted accordingly.
The Post Driver assembly procedure consists
of the following subsections:
1
.
Main Carriage Channel
2
.
Stabilizer Legs (optional)
3
.
Base Plate
4
.
Hydraulic Valve
5
.
Safety Stop Adjustment
6
.
Rubber Debris Guard
7
.
Safety Arm
8
.
Document Storage Tube
WARNING
WARNING
8
Summary of Contents for HD-12-H
Page 44: ...44 Service Parts 44 Driver Assembly ...
Page 46: ...46 Hydraulic Base Plate Assembly ...
Page 55: ...Notes 55 ...