
Work sheet: AB-820 500
Installation of screw connections
03/07/2019
-AB-2 -
4 Hose connections (4 and 6 mm nozzle for OVERPRESSURE)
1. Push the wire or screw clip over the hose
2. Push the hose onto the Cu pipe or hose nozzle (heat or moisten PVC
hose as necessary). The hose must fit tightly all round
3. Wire clip: press together with pliers and push onto the connection
point
Screw clip: push onto the connection point and tighten with screw-
driver
Make sure that the clip is an even tight fit.
5 Hose connections (4 and 6 mm nozzle for NEGATIVE PRESSURE)
For negative pressure applications with which there is no overpressure
on the connection lines even in case of a leak, as point 5 but without
clips.
For negative pressure applications with which there may be overpres-
sure, as point 5.
Summary of Contents for VLR 230
Page 19: ...I I II II III III IV IV 21 21 21 21 20 20 20 20 27 11 2002 P 060 000...
Page 27: ...21 02 2017 SL 853 600 2 6 4 5 3 11 12 1 AC DC 105 106 102 71 01 69 24 1 24 3 59 09 76 17 60 Rp...
Page 29: ...22 84 85 85 22 52 98 98 0 Kl 1 0 17 12 2002 P 115 392 21 21 20 20 90 90...
Page 39: ...28 06 2005 D i hrbild Abmes 200 3 0 0 2 6 0 220 T 140 8 Dimension Drilling...