VACUUM LEAK DETECTOR VLR ..
2020-06-29
14
6.4.8 Tightness test on the leak detection system
(1) Check that all the shut-off valves between the leak detector and interstitial space are open.
(2) Connect the measuring gauge to three-way valve 21, position III.
(3) For the tightness test, the vacuum pump must have reached the "pump OFF" switching val-
ue. Wait for possible pressure compensation and then begin with the tightness test.
(4) It must be evaluated as positive if the values in the following table are observed. A higher
drop in pressure means increased stress on the wear parts.
Volume of intersti-
tial space in litres
1 mbar drop in
pressure in
Volume of intersti-
tial space in litres
1 mbar drop in
pressure in
100
9 minutes
2000
3.00 hours
250
22 minutes
2500
3.75 hours
500
45 minutes
3000
4.50 hours
1000
1.50 hours
3500
5.25 hours
1500
2.25 hours
4000
6.00 hours
(5) Test cock to position I, remove measuring gauge.
6.4.9 Setting up the operating condition
(1) Seal the housing
(2) Seal the shut-off valves (between leak detector and interstitial space) in the open position
for every interstitial space connected.
6.5. Alarm
(1) In case of alarm the "alarm" signal lamp lights up and the audible signal sounds.
(2) If available, close the shut-off valves in the connection line between interstitial space and
leak detector.
(3) Switch off the audible signal by pressing the "mute" button. The button will light up.
(4) Determine the cause of the alarm signal according to the table in chapter 3.5.1.
(5) Inform the installation company (detailing the cause of the problem if possible).
(6) The installation company has to determine and eliminate the cause.
(7) Carry out the functional test according to chapter 6.4, observing the conditions specified in
chapters 4 to 6.2.
7. Marking
•
Type
•
Electrical data
•
Manufacturer or manufacturer's mark
•
Model year (month / year)
•
Serial number
•
Statutory marks
Summary of Contents for VLR 230
Page 19: ...I I II II III III IV IV 21 21 21 21 20 20 20 20 27 11 2002 P 060 000...
Page 27: ...21 02 2017 SL 853 600 2 6 4 5 3 11 12 1 AC DC 105 106 102 71 01 69 24 1 24 3 59 09 76 17 60 Rp...
Page 29: ...22 84 85 85 22 52 98 98 0 Kl 1 0 17 12 2002 P 115 392 21 21 20 20 90 90...
Page 39: ...28 06 2005 D i hrbild Abmes 200 3 0 0 2 6 0 220 T 140 8 Dimension Drilling...