APPENDIX ZD …
VACUUM LEAK DETECTOR VLR ..
29/06/2013
ZD-1
1. Subject
ZD … "Additional pressure switch" for applications in which this equipment is required,
e.g. when certain piping lengths are exceeded (see approval for double-walled pipes).
2. Field of application
(1)
ZD … can be installed outdoors
(2) Components in contact with the conveyed product are made of V4A, PE and PP
(3) Pressure-resistant up to 25 bar
3. Electrical connections
Connect terminals 10 / 11 of the VL-HFw2 an
d terminals 21 / 22 of the VLR …/E to the
terminals with the same names on the ZD
….
4. Start-up
After installation and electrical connections are complete:
4.1. In conjunction with the VL-HFw2 leak detector
Connect the ZD to terminals 10 and 11 of leak detector VL-HFw2.
(1) Press button on the ZD (so that it latches).
(2) Press start-up button on the VL-HFw2 and generate underpressure in the system.
(3) After the operating underpressure is reached, press the start-up button again (also see
documentation for the above-mentioned leak detector).
4.2.
In conjunction with the VLR …/E leak detector
Connect the ZD as a "sensor" to terminals 21 and 22 in leak detector VLR
…/E.
4.2.1
VLR
…/E WITHOUT connected solenoid valve
(1) Do not press button (not latched).
(2) Generate operating underpressure in the system.
(3) When the switching value "Alarm OFF" of the ZD
… is reached, the "Sensor alarm" on the
leak detector is cleared.
Summary of Contents for VLR 230
Page 19: ...I I II II III III IV IV 21 21 21 21 20 20 20 20 27 11 2002 P 060 000...
Page 27: ...21 02 2017 SL 853 600 2 6 4 5 3 11 12 1 AC DC 105 106 102 71 01 69 24 1 24 3 59 09 76 17 60 Rp...
Page 29: ...22 84 85 85 22 52 98 98 0 Kl 1 0 17 12 2002 P 115 392 21 21 20 20 90 90...
Page 39: ...28 06 2005 D i hrbild Abmes 200 3 0 0 2 6 0 220 T 140 8 Dimension Drilling...