22
│ 3 Using the system
3
Using the system
3.1
Preparing the system
Two suitable measurement locations must be found depending
on conditions on the ground. Suitable measurement locations
include, for example, fittings or the pipe itself.
1. Attach a microphone to each of the measurement locations.
−
The same microphone type must be used at the two meas-
urement locations.
2. Connect each of the microphones to an
RT 200
. The
RT 200
will switch on automatically.
3. Switch on the
C 200
receiver. The system is ready for use.
3.2
Measurement steps (overview)
Once the system has been prepared, location can begin.
A measurement comprises the following steps:
1.
Configuring the pipe sections
2. Starting a measurement
3. Stopping a measurement
4.
Selecting and adjusting filters
(optional) (section 3.5.2 on page 34)
5. Saving a measurement
(optional) (section 3.4.3 on page 27)
3.3
Configuring the pipe sections
A measuring section can comprise one or more pipe sections.
Each pipe section is characterised by its pipe data. New pipe
sections are automatically assigned values from the
Pipe data
(Default)
.