VIDEOSURVEILLANCE SYSTEMS
SENTRY
WAY
®
CT V2 001
Page 47 of 70
System Installation Guide
For the following sections: start again the same process with two sections and one coupler on the floor.
Each section assembled two by two is installed one after the other.
The installation to the ceiling of each assembled
section is done in the same way as before: press
the aluminum cap and insert first the top screws
and then side screws.
Pre-screw the nuts and adjust the plastic rails to make sure
that they are well aligned and on the same level. Then you can
tighten the nuts firmly holding the plastic rails to avoid any
gaps. Still screw the nuts diagonally. Start with the nuts that are
on the sides of the plastic rails checking that the space between
both sections is the same on each side of the plastic rail.
7
8
Summary of Contents for CurveTrack
Page 2: ......
Page 16: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 16 of 70 System Installation Guide 1 35 m...
Page 39: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 39 of 70 System Installation Guide...
Page 52: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 52 of 70 System Installation Guide...