VIDEOSURVEILLANCE SYSTEMS
SENTRY
WAY
®
CT V2 001
Page 48 of 70
System Installation Guide
Before the installation of the
copper pipes, you have to insert
shock absorbers at all plastic junctions and
all copper junctions. Those are 3M VHB
19mm
10
Once you have installed all the
sections, you can fix the end caps to
both extremities of the rail.
9
Installation of the copper pipes
The copper pipes are clipped into the plastic rail
on the shock absorbers that wedge them.
Summary of Contents for CurveTrack
Page 2: ......
Page 16: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 16 of 70 System Installation Guide 1 35 m...
Page 39: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 39 of 70 System Installation Guide...
Page 52: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 52 of 70 System Installation Guide...