![Sentryway CurveTrack System Installation Manual Download Page 65](http://html1.mh-extra.com/html/sentryway/curvetrack/curvetrack_system-installation-manual_1245128065.webp)
VIDEOSURVEILLANCE SYSTEMS
SENTRY
WAY
®
CT V2 001
Page 65 of 70
System Installation Guide
Upon initialization, the carriage calibrates the camera and then travels down the rail toward the Terminator
end of the system run. Once the carriage reaches the far-end bumper, the carriage stops, reverses direction, and
begins searching for the Limit Switch Actuator magnet and the bumper at the RF Adapter end of the system
run.
With the carriage operating in AutoMode, verify that the DC voltage on the copper conductors is between 23
VDC and 24 VDC.
Refer to the « Programming instructions CT V2 001 » file.
13. System initialization and powering up
13.1 Power up / Initialization
13.2 Programming instructions
CAUTION
Before powering up the system, make certain that foam bumpers
are installed on each end of the system run.
Summary of Contents for CurveTrack
Page 2: ......
Page 16: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 16 of 70 System Installation Guide 1 35 m...
Page 39: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 39 of 70 System Installation Guide...
Page 52: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 52 of 70 System Installation Guide...