www.blazecut.com
Page 62 of 93
ILP CLEAN AGENT MANUAL-ILPCAM1904
BlazeCut and the BlazeCut logo are the registered trademarks of BlazeCut
© 2019 BlazeCut, All rights reserved
Inspection and test intervals stated in the table are minimum intervals required by the manufacturer. If the
legislation in place of installation require shorter intervals as stated in the table or additional inspections and
tests, which are not stated in the table, it is necessary that these inspections are performed in accordance with
this legislation. Additionally, if the enviroument where the system is installed is harsh, the system may require
inspections every 3-6 months due to possible damage that may occur.
7.1.
COMPREHENSIVE INSPECTION OF THE SYSTEM
Basic points of inspection of the system:
Check completeness of the system,
Clean surface of the cylinder and the valve of the cylinder, tubes, pressure gauge and of nozzles from
major dirt,
Check surface of the cylinder, focus on possible changes in shape of the cylinder, mechanical damage,
signs of corrosion, signs of leak, etc.; in case of damage of the cylinder or the valve of the cylinder replace
them immediately,
Check firmness of the connection of the discharge network, check correct tightening of the fittings with
spanner,
Check firmness of the connection of the BlazeTube detection by gently pulling the tube,
Check that the discharge network is not damaged, focus on possible change of shape, color, dents,
damage caused by temperature or mechanical damage; in case of damage replace them,
Check firmness of the fastening of the cylinder in the bracket, check the fastenings of the hoses/tubes,
of the nozzles, firmness of the fastening of the electrical installation, check firmness of the mounting of
the cable connectors depending on installed components (the solenoid, the pressure switch/transducer,
the alarm panel etc.),
Check cleanliness of the nozzle; the nozzles cannot be covered with dirt and grease; do not clean
forcibly,
Clean and check that all corresponding labeling of the system and warning labels marking the area
protected by system BlazeCut are undamaged; if they are damaged, replace them.
Remove detected defects immediately. During replacement of components and reconnecting the tubes, the
electrical installation and during pressurization of the system proceed in accordance with the procedures
described in Chapter 11.
7.2.
INSPECTION OF PRESSURE IN THE SYSTEM
The pressure of the system is inspected by control pressure gauge situated on the valve of the cylinder or on the
end of line device. If both pressure gauges are installed use the most accessible pressure gauge.
During inspection of pressure the ball valve on the valve of the cylinder must be open to inspect pressure in the
system correctly (like during regular operation of the system). During inspection the system cannot be heated
(e.g. during operation of the protected enclosure) and exposed to a direct sunlight.
When mounting and unmounting the pressure gauge or control pressure gauge to the end of line
device the ball valve of the outlet of the BlazeTube detection must be always closed.
During inspection proceed as follows:
Read pressure on pressure gauge and remove it.
Measure pressure by installing control pressure gauge (with adapter compatible with outlet M10x1) and
compare detected value with data from the pressure gauge of the system. Values must be equal,
permissible tolerance of pressure is maximum 1 bar. In case of discrepancy replace the pressure gauge
of the system.