background image

 

be connected to implement communications and monitor inverter, 

 

referring to 

Product User Manual

 

 

 

Notes 

SE WIFI 

and SE GPRS_R modules are optional; SE WIFI, SE 

 

GPRS_R, 

and SE Touch are introduced in 

Product User Manual 

 

which is available from http://www.sernergytec.com. 

 

 

 

 
 
 
 
 

RS485 

(for single inverter) 

 

You  can  connect  RS485  communications  module  to  inverter  for  monitoring  in  two 

ways:  connecting  to  single  inverter  and  to  multiple  inverters.  Figure  5.17 

demonstrates connection to single inverter to implement RS485 communications. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Figure 5.17 

RS485 c

ommunications mode for a single

 

inverter 

 
 
 
 

 

RS485 communications mode 

(for multiple inverters, shown in Figure 5.18) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

40 

Summary of Contents for SE 10K Series

Page 1: ...5K 6K 8K 10K 12K 15K User Manual Ver 00 Shenzhen Senergy Technology Co Ltd 1...

Page 2: ...1 1 Function 9 2 1 2 Model Description 10 2 2Network Application 10 2 2 1 Grid tied PV Power Systems 10 2 2 2 Supported Power grids 10 2 3Outline and Dimensions 11 2 3 1 Dimensions 11 2 3 2 Outline 11...

Page 3: ...munications Cables 39 5 4 1 5K 6K 8K 10K 12K 15K Communications Mode Description 39 5 4 2Connecting RS485 Communications Cables 41 5 4 3 Setting RS485 Communications Address 44 6 Installation Verifica...

Page 4: ...rough the manual carefully before any operation and keep the manual well for future reference Application Model Grid tied PV string inverter 5K 6K 8K 10K 12K 15K Intended Audience This user manual is...

Page 5: ...ll result in serious injury or death Indicates a potentially hazardous situation which if not correctly WARNING followed could result in serious injury or death Indicates a potentially hazardous situa...

Page 6: ...an must read through User Manual carefully and master it before any installation and operation 1 2 The PV Inverter Protection NOTICE As soon as receiving the inverter please check if it is damaged dur...

Page 7: ...efer to Chapter 4 Installation 1 4 Electrical Connections DANGER Before installing the inverter check all electrical ports to ensure no damage and no short circuit Otherwise personal casualty and or f...

Page 8: ...is operating its partial parts will be extremely hot and can cause burns 1 6 Maintenance Power OFF all electrical terminals before the inverter maintenance DANGER strictly comply with the safety preca...

Page 9: ...cess etc 2 1 Functional Models 2 1 1 Function This series 5K 6K 8K 10K 12K 15KTL is a three phase grid tied PV string inverter transformer less that converts the DC power generated by PV strings into...

Page 10: ...id tied PV power systems for industrial commercial rooftops fishing farmers light complementary power generation systems and large ground based power stations Generally these series inverters are used...

Page 11: ...r 2 3 Outline and Dimensions 2 3 1 Dimensions Figure 2 4 shows the dimensions of the inverter as follows Figure 2 4 The dimensions of the inverter by front lateral views unit mm 2 3 2 Outline Figures...

Page 12: ...Figure 2 5 The front view and amplification effect of LED indicator area Figure 2 6 The rear view of the inverter 12...

Page 13: ...nd 3rd routes terminals merging into one independent MPPT Then the inputs are grouped into two MPPT routes inside the inverter to track the maximum power point of the PV strings These two MPPT power i...

Page 14: ...ter to switch between working modes Table 2 1 Working modes description Modes Description Standby The PV inverter enters the standby mode when the input voltage of PV Strings can enable auxiliary powe...

Page 15: ...l box if the PV inverter is unpacked Store the PV inverter at a temperature range of 40 C to 70 C and with the relative humidity of 0 to 100 no condensing The PV inverter should be stored in a clean a...

Page 16: ...into contact with its enclosure and heat sinks to avoid electrical shock burn 4 1 Checking the Outer Packing a When receiving the inverter check that the packing materials are intact b After unpacking...

Page 17: ...of the inverter as shown in Figure 4 2 CAUTION Figure 4 2 Moving the inverter The inverter is relatively heavy To prevent device damage and personal injury arrange two people to move the inverter and...

Page 18: ...k There are residual voltages in the PV inverter It needs 10 minutes to finish discharge The PV inverter must not be touched when in operation Its enclosure and heat sinks are extremely hot Electrical...

Page 19: ...in a place where personnel are likely to come into contact with its enclosure and heat sinks because these parts are extremely hot during operation d Do not install the inverter in an area that stores...

Page 20: ...t of the inverter c Do not install the inverter on a wall made of gypsum boards or similar materials with weak sound insulation to avoid noise disturbance in a residential area Installation Space Requ...

Page 21: ...shown in Figure 4 5 if sufficient space is available and install them in triangle mode as shown in Figure 4 6 or in stacked mode as shown in Figure 4 7 if no sufficient space is available The installa...

Page 22: ...Figure 4 6 Installation in triangle mode unit mm 22...

Page 23: ...n they are installed in a hot area 4 4 2 Installation Mode Requirements Install the inverter upright or at a maximum back tilt of 15 degrees to facilitate heat dissipation Below are some correct wrong...

Page 24: ...OTICE 4 5 Wall mounting the Inverter Before installing you have to prepare expansion bolts specification M6 60 Quantity 3 Step 1 Move out the rear panel from packing case Step 2 Determine the position...

Page 25: ...marker as shown in Figure 4 11 Figure 4 11 marking the hole positions While drilling the hole on the wall ensure no damage on the electric DANGER wire and or water pipe inside the wall Step 4 Drill h...

Page 26: ...re 4 13 Figure 4 13 Securing a rear panel 5 Electrical Connections Before performing any electrical connections ensure that both DC DANGER and AC Switches are OFF Otherwise the high voltage can result...

Page 27: ...pared with below requirements 2 a Ground cable Outdoor copper core cables with a cross sectional area of 6 mm or more are recommended Good grounding for the inverter helps resist the impact of surge v...

Page 28: ...th unit mm Step 2 Insert the exposed core wires into the crimping area of the OT terminal and crimp them using hydraulic pliers as shown in Figure 5 2 Figure 5 2 Crimping a cable unit mm Step 3 Secure...

Page 29: ...core cables are recommended Single strand cables or aluminum cable is forbidden for inverter output terminal Table 5 1 describes the specifications Table 5 1 AC output cable specifications recommended...

Page 30: ...nals Leak protective switch is not recommended in this system if there is a must please install a model B switch with no less than 300mA current leakage Neutral wire sharing is forbidden for multi lea...

Page 31: ...ut cable using a wire stripper as shown in Figure 5 4 Figure 5 4 Stripped length unit mm Step 2 Crimp Euro type terminals using special crimping tool shown in Figure 5 5 Figure 5 5 Crimping Euro type...

Page 32: ...C terminal block tighten them using screw driver and the required torque is 1 5 N m shown as in Figure 5 7 Figure 5 7 Tightening AC cable Step 5 Aligning with the hole position on the AC terminal cove...

Page 33: ...cting the PV modules shield them with opaque cloth Before connecting DC input power cables ensure that the voltage on the DC side is within its safe range and that the DC SWITCH on the inverter is OFF...

Page 34: ...or negative terminals of PV strings cannot be connected with short circuit The total output power of PV strings must be always lower than or equal to maximum input power of inverter 5 3 1 Preparation...

Page 35: ...specifications Inverter model Cable Type Cross sectional Area Cable Outer mm2 Diameter mm Range Recommended Range Value 5K 6K 8K 10K Common PV cables 2 5 4 4 4 5 12K 15K in the industry model PV1 F c...

Page 36: ...sion 5 3 2 Connecting DC Power Cables Step 1 Remove an appropriate length of the insulation layer from the positive and negative power cables using a wire stripper as shown in Figure 5 11 Figure 5 11...

Page 37: ...nd negative power cables into the corresponding positive and negative connectors until a click sound is heard as shown in Figure 5 13 Figure 5 13 Connecting positive and negative connectors Step 4 Tig...

Page 38: ...at the polarities of the DC input power cables are correct as shown in Figure 5 15 Figure 5 15 Checking the voltage of every route Strings Step 6 Insert the positive and negative connectors into the c...

Page 39: ...ications You can set inverter parameter and monitor running data of the inverter through SE Touch APP in mobile phone for details referring to Accessary Modules Installation Guide DB9 DB9 communicatio...

Page 40: ...ailable from http www sernergytec com RS485 for single inverter You can connect RS485 communications module to inverter for monitoring in two ways connecting to single inverter and to multiple inverte...

Page 41: ...ally through SE Touch APP in mobile phone for details referring to Accessary Modules Installation Guide If multiple inverters are connected turn RS485 Resistance to ON from the dial switch of the inve...

Page 42: ...0 Figure 5 20 Stripping an RS485 communications cable unit mm Step 2 Remove the screws at the inverter bottom to remove the metal plate shown in Figure 5 21 Figure 5 21 Removing the metal plate Step 3...

Page 43: ...ry kit remove the 4 screws from its male terminal and connect with RS485 cable as shown in Figure 3 19 Figure 5 23 RS485 Terminal block connection Step 5 Connect RS485 male terminal with its female te...

Page 44: ...port 5 4 3 Setting RS485 Communications Address Step 1 Input http www Senergy com in your mobile browser and click to download SE Touch APP which can also be available by scanning below QR code shown...

Page 45: ...ding to Table 6 1 Table 5 4 Self check items after installation 1 No other objects put on the PV inverter 2 All screws especially the screws used for electrical connections are tightened 3 The PV inve...

Page 46: ...ter 7 1 Powering ON the Inverter Step 1 Switch ON the AC circuit breaker Step 2 Set the DC SWITCH of the inverter to ON Step 3 Observe statuses of LED indicator lights on the inverter according to Tab...

Page 47: ...us indicator priority when the communications with higher priority is ON the communications with lower priority will be OFF DB9 is with the top priority and RS485t is secondary Bluetooth WIFI GPRS ON...

Page 48: ...h For NOTE details about operation refer to Accessory Module Installation Guide which is available for free from http www Senergytec com Table 8 2 LED indicator status for common inverter fault PV Gri...

Page 49: ...ng original status 8 3 Setting Standard Parameters Step 1 Open APP and choose Bluetooth click BLExxxx to login then click the function list and choose Setting Step 2 Click switch user enter password a...

Page 50: ...49...

Page 51: ...of NA Weekly output electrical yield and monitor its abnormal status status inverter Check periodically that the heat sink is free Clean periodically yearly cleaning from dust and blockage the heat si...

Page 52: ...e exceeds 1 If the alarm occurs accidentally possibly the Over the allowable range power grid is abnormal accidentally No extra Voltage action is needed 2 If the alarm occurs repeatedly contact the lo...

Page 53: ...ction on SE Touch Residual The insulation resistance 1 If the alarm occurs accidentally possibly the Current against the ground at the external circuits are abnormal accidentally The Abnormal input si...

Page 54: ...ST Fault EEPROM EEPROM Component Replace the monitoring board Fault damaged Remote monitoring displays Reboot router or other data collector logger if fail zero Communications again please contact Sen...

Page 55: ...clear the preceding alarm according the measures NOTE recommended contact Senergy customer service center timely 9 3 Removing the Inverter Perform the following procedures to remove the inverter Step...

Page 56: ...o in a contract quality warranty period of the inverter is 60 months 2 As for the PV inverter which is defective or damaged within its quality warranty period Senergy shall repair or replace it for fr...

Page 57: ...or using faulty 8 Any revising the product or modifying its software code without authorization 9 Maintenance faulty caused by the technician personnel unauthorized by Sernegy 10 Any operation ignori...

Page 58: ...W 12 000W 14 400W 18 000W power Max input 1000V 1000V 1000V 1000V 1000V 1000V voltage Max input 22A 22A 22A 22A 33A 33A current 1 11A 1 1 1 11A 1 1 1 11A 1 11A 1 11A 1 11A 2 11A 1 11A 2 11A 1 11A 1A 1...

Page 59: ...A 16 67A 20 83A current Max output 3 8 3A 3 10A 3 13A 3 16A 3 19A 3 23A current Current 3 10A 3 10A 3 10A 3 10A 3 10A 3 10A Inrush Max output 3 14A 3 14A 3 18A 3 23A 3 27A 3 32A current under fault co...

Page 60: ...P65 IP65 IP65 IP65 IP65 IP65 level Pollution PD3 PD3 PD3 PD3 PD3 PD3 degree Operating temperature 25 60 25 60 25 60 25 60 25 60 25 60 Display Communications Display LED indicator light Bluetooth LCD d...

Page 61: ...oltage range can be set according to national voltage standards 2 Power grid frequency range can be set according to national grid standards 3 The preceding technical specifications are subject to cha...

Page 62: ...0755 85245541 Fax 86 0755 85245541 Add Room 514 515 Building A Co talent Creative Park No 2 LiuXian Road Block 68 Xin an Street Bao an District ShenZhen China Postcode 518101 E mail service Senergytec...

Reviews: