![Senergy SE 10K Series User Manual Download Page 18](http://html1.mh-extra.com/html/senergy/se-10k-series/se-10k-series_user-manual_1239620018.webp)
4.3 Identify the Inverter
4.3.1 Nameplate
After moving the PV inverter from packing box, identify it by reading its nameplate
labeled on the side. The nameplate contains important product information: the model
information, communications/ technical specifications, and compliance.
4.3.2 Compliance and Safety Symbols
Safety symbol
Description
Electrical shock!
There are residual voltages in the PV inverter. It needs 10 minutes to
finish discharge.
The PV inverter must not be touched when in operation. Its
enclosure and heat sinks are extremely hot.
Electrical shock! This part is charged. Only qualified and/or trained
electrical technicians are allowed to perform operations on the
inverter.
If the inverter service life has expired, dispose it in accordance with
local rules for disposal of electrical equipment waste. Do not dispose
the PV inverter with household garbage.
The PV inverter is compliant with CQC.
18