
29
www.selwoodproducts.com
D:
In between (1774) CE Gap Boards and (1780) Center Board place 4 (1776) Floor Boards making sure all
boards are evenly spaced. Attach to (1764) Floor Front, (1761) Side Joist and (1763) Floor Joist using 5 (S2)
#8 x 1-1/2” Wood Screws per board. (fig. 13.3)
Wood Parts
Hardware
4 x
Floor Board 1 x 6 x 23-1/2”
20 x
#8 x 1-1/2” Wood Screw
1776
S2
Fig. 13.3
S2
1761
x 5 per
board
(hidden under floor boards)
1780
Step 13: Floor Assembly
Part 2
1764
1776
1774
1774
2463
1763
(hidden under floor boards)