28
www.selwoodproducts.com
Wood Parts
Hardware
Step 13: Floor Assembly
Part 1
1 x
Floor Joist 5/4 x 2 x 38-1/2”
1 x
Centre Board 1 x 6 x 23-1/2”
2 x
CE Gap Board 1 x 6 x 23-1/2”
15 x
#8 x 1-1/2” Wood Screw
2 x
#8 x 2-1/2” Wood Screw
1763
S2
A:
From inside of the assembly, measure 3-1/8” down from the top of each (2448) SW Floor then attach (1763)
Floor Joist to each board with 1 (S3) #8 x 2-1/2” Wood Screw per end. (fig. 13.1 and 13.2)
B:
Tight to both (2448) SW Walls install 1 (1774) CE Gap Board to each end of the assembly attaching to (1764)
Floor Front, (1761) Side Joist and (1763) Floor Joist using 5 (S2) #8 x 1-1/2” Wood Screws per board. Make
sure the boards are tight to (2463) Floor Back. (fig. 13.1 and 13.2)
C:
Install (1780) Center Board to (1764) Floor Front, (1761) Side Joist and (1763) Floor Joist using 5 (S2) #8 x
1-1/2” Wood Screws. Make sure the board is tight to (2463) Floor Back and the gap fits around (1747) Centre
Divider. (fig. 13.1 and 13.2)
Fig. 13.2
Fig. 13.1
1763
2448
S2
Tight
3-1/8”
S3
S3
2448
1774
1761
x 5 per board
2448
1774
2463
1780
2448
1774
1780
1747
1764
S3