iv
INTRODUCTION
Parts replacement, maintenance inspections and troubleshooting should be carried out by site maintenance personnel
or other qualified professionals. This manual includes directions for potentially dangerous procedures which should
only be carried out by professionals with the appropriate specialized knowledge.
The site maintenance personnel or other qualified professionals mentioned in this manual are defined as follows:
Site maintenance personnel:
Individuals with experience in maintaining amusement equipment, vending machines, etc., working under the super-
vision of the owner/operator of this product to maintain machines within amusement facilities or similar premises by
carrying out everyday procedures such as assembly, maintenance inspections, and replacement of units/expendable
parts.
Activities to be carried out by site maintenance personnel:
Amusement equipment/vending machine assembly, maintenance inspection and replacement of units/expendable
parts.
Other qualified professionals:
Persons employed by amusement equipment manufacturers, or involved in design, production, testing or mainte-
nance of amusement equipment. The individual should have either graduated from technical school or hold similar
qualifications in electrical/electronics/mechanical engineering.
Activities to be carried out by other qualified professionals:
Amusement equipment/vending machine assembly, repair/adjustment of electrical/electronic/mechanical parts.
Procedures not described in this manual or marked as ‘to be carried out by site
maintenance personnel or other qualified professionals’ should not be carried
out by personnel without the necessary skill or technology. Work carried out by
unqualified persons may cause serious accidents, including electrocution.
Definition of 'Site Maintenance Personnel or Other Qualified Individuals'
Summary of Contents for Let's Go Jungle
Page 9: ...HANDLING PRECAUTIONS Serial No Display Electrical Specifications Display...
Page 98: ...CONTROL UNIT 93 11 FIG 11 5c FIG 11 5d SLIDE RAIL SLIDE PART X AXIS VOLUME GEAR ENGAGEMENT...
Page 103: ...CREDIT BOARD SETTINGS CREDIT BOARD SETTINGS 12a 12...
Page 104: ...CREDIT BOARD SETTINGS 12...
Page 105: ...CREDIT BOARD SETTINGS CREDIT BOARD SETTINGS 12 12a...
Page 121: ...116 PARTS LIST 18 1 TOP ASSY LGJ D 1 2 7 8 301 302 303...
Page 123: ...118 PARTS LIST 18 2 ASSY MAIN CABINET LGJ 1000 D 1 2 Figure seen from B...
Page 125: ...120 PARTS LIST 18 3 ASSY FRONT CABINET LGJ 1020 D 1 2...
Page 130: ...PARTS LIST 125 18 7 ASSY REAR CABINET LGJ 1050 D 1 2 Figure seen from D Figure seen from E...
Page 134: ...PARTS LIST 129 18 10 ASSY SUB CABI REAR LGJ 1170XUK D 1 2 A Details of part A SCALE 1 5...
Page 136: ...PARTS LIST 131 18 11 CONTROL UNIT L LGJ 3000 D 1 3...
Page 139: ...134 PARTS LIST 18 12 CONTROL UNIT R LGJ 3050 D 1 3...
Page 147: ...142 PARTS LIST 18 18 ASSY SEAT CABINET LGJ 1200 D 1 2 Figure seen from B...
Page 157: ...152 PARTS LIST 18 27 ASSY BILLBOARD BOX LGJ 1400UK D 1 2 Figure seen from B...
Page 161: ...156 PARTS LIST 18...
Page 162: ...157...
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......