40
ASSEMBLY AND INSTALLATION
6
3
Fully insert the power cord plug into the outlet.
4
When using a ground wire made available separately, connect one
end of the wire to the AC unit ground terminal and the opposite end
to an indoor ground terminal. The AC unit ground terminal is a bolt-
and-nut combination. Remove the nut and pass the bolt through the
ground terminal, then secure the nut to the bolt. <For Taiwan>
5
The power cord is laid out indoors. Protect the
power cord by attaching wire cover to it.
If ground will be established with a ground wire
made available separately, lay out the ground
wire indoors and have it protected.
<For Taiwan>
FIG. 6-12c
FIG. 6-12d
Summary of Contents for Let's Go Jungle
Page 9: ...HANDLING PRECAUTIONS Serial No Display Electrical Specifications Display...
Page 98: ...CONTROL UNIT 93 11 FIG 11 5c FIG 11 5d SLIDE RAIL SLIDE PART X AXIS VOLUME GEAR ENGAGEMENT...
Page 103: ...CREDIT BOARD SETTINGS CREDIT BOARD SETTINGS 12a 12...
Page 104: ...CREDIT BOARD SETTINGS 12...
Page 105: ...CREDIT BOARD SETTINGS CREDIT BOARD SETTINGS 12 12a...
Page 121: ...116 PARTS LIST 18 1 TOP ASSY LGJ D 1 2 7 8 301 302 303...
Page 123: ...118 PARTS LIST 18 2 ASSY MAIN CABINET LGJ 1000 D 1 2 Figure seen from B...
Page 125: ...120 PARTS LIST 18 3 ASSY FRONT CABINET LGJ 1020 D 1 2...
Page 130: ...PARTS LIST 125 18 7 ASSY REAR CABINET LGJ 1050 D 1 2 Figure seen from D Figure seen from E...
Page 134: ...PARTS LIST 129 18 10 ASSY SUB CABI REAR LGJ 1170XUK D 1 2 A Details of part A SCALE 1 5...
Page 136: ...PARTS LIST 131 18 11 CONTROL UNIT L LGJ 3000 D 1 3...
Page 139: ...134 PARTS LIST 18 12 CONTROL UNIT R LGJ 3050 D 1 3...
Page 147: ...142 PARTS LIST 18 18 ASSY SEAT CABINET LGJ 1200 D 1 2 Figure seen from B...
Page 157: ...152 PARTS LIST 18 27 ASSY BILLBOARD BOX LGJ 1400UK D 1 2 Figure seen from B...
Page 161: ...156 PARTS LIST 18...
Page 162: ...157...
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......