3
1. HANDLING
PRECAUTIONS
When installing or inspecting the machine, be very careful of the following points and pay
attention to ensure that the player can enjoy the game in safety.
Non-compliance with the following points or inappropriate handling running counter to the
cautionary matters herein stated can cause personal injury or damage to the machine.
•
Before performing the work, be sure to turn the power off. Performing the work
without turning off the power can cause electric shock or short circuit. In the case
where work should be performed in the status of power on, this manual will state to
that effect.
•
To avoid electric shock or short circuit, do not apply or disconnect power to the
machine in a quick or haphazard manner.
•
To avoid electric shock, do not apply power to the machine with wet hand(s).
•
Do not expose Power Cords or Earth Wires on the surface, (floor, passage, etc.) If
exposed, the Power Cord or Earth Wires are sustainable to damage. Damaged
Cords or Wires can cause an electric shock or short circuit which may lead to a fire
hazard.
•
To avoid causing a fire and or electric shock, do not put objects on Power Cords or
Earth Wires.
•
When or after installing the product, do not unnecessarily pull the Power Cord. If
damaged the Power Cord may cause an electric shock and or fire hazard.
•
In case the Power Cord is damaged, ask for a replacement through where the
product was purchased or the office stated herein. Using a damaged Power Cord can
cause and electric shock or fire hazard.
•
Be sure to perform correct earth checks and make sure that the machine is correctly
earthed. Inappropriate earthing of the product may cause electric shock or fire
hazard.
•
Be sure to use fuses which meet the specified rating. Using fuses which exceed the
specified rating can cause electric shock, short circuit and or fire hazard.
•
Ensure all connections are made fully. Connections which are not fully made may
cause electric shock or fire hazard.
•
To avoid causing a fire hazard or an electric shock, do not make any unspecified
changes to the product by replacing or changing parts or components without the
express consent of SEGA.
•
Be sure to make periodic maintenance checks as stated herein.
•
Only a QUALIFIED ELECTRONICS ENGINEER is allowed to perform IC BOARD
inspection or analysis using a LOGIC ANALYSER. The use of a MULTIMETER is not
permitted on IC BOARDS.
•
When cleaning the CRT surfaces, use a soft dry cloth. Do not apply chemicals such
as thinners, benzene, etc.
•
The electronic parts on the IC BOARD could be damaged due to human body static
electricity. Before performing IC BOARD related work, be sure to discharge physically
accumulated static by discharging on a grounded metallic surface.
Summary of Contents for FORD RACING TWIN-FULL BLOWN
Page 25: ...20 Step 2...
Page 72: ...67 Once removed replace the lamp with new and reassemble in reverse...
Page 74: ...69 Replace the bulb or LED with the correct type and reverse process to re assemble...
Page 88: ...83 24 DESIGNED RELATED PARTS...
Page 89: ...84 25 PARTS LIST...
Page 91: ...86 25 2 ASSY MAIN 1P FR 10001UK Continues overleaf...
Page 94: ...89 25 4 ASSY HANDLE MECHA FR 2500UK...
Page 102: ...97 25 16 ASSY BRAKE ACCEL SPG 2200...
Page 103: ...98...
Page 109: ......
Page 110: ......