LCQ / LCS / LCQI / BMQ / CPQ / TBQ / TBS / TBQI / TBSI EVAPORATIVE COOLER INSTALLATION MANUAL
|
3
Step 22
FINAL CHECK
Complete the commissioning checklist at
the end of this document.
Step 23
CLEAN UP
Clean up the site!
Step 16
INSTALL WATER SENSOR
Ensure the clip is fully engaged.
Step 24
CUSTOMER HANDOVER
Show the customer how to operate the
cooler. Give them both the controller and
cooler owner’s manual.
Explain maintenance requirements.
Page 15
Page 15
Page 10
Page 16
Step 4
REMOVE TRANSITION
Press the clips inwards to release the
transition from the tank.
Step 10
MOUNT THE COOLER
Lower the cooler onto the transition.
Step 5
PREPARE THE DROPPER
Cut hole & fit the grommet in the dropper
for power and control cables.
Step 11
CABLE INSTALLATION
Run the power and control cable
down the conduit and out through the
grommet.
Step 17
INSTALL VENTURI / FAN
Ensure the venturi is fully located into the
tank and the motor lead is not caught or
pinched.
Step 6
MOUNT DROPPER
Position, level and secure the dropper.
Flash the dropper to prevent water
ingress into the roof cavity.
Step 12
LOCAL REGULATIONS
Read and adhere to local electrical and
plumbing rules and regulations.
Step 18
ELECTRICAL CONNECTIONS
Connect the cooler components to the
electronics module. Plug the mains cable
into the electronics module.
Page 4
Page 7
Page 5
Page 11
Page 5
Page 8
Page 11
Page 7
QUICK GUIDE